Ventus at Metrogate construction time lapse

Ventus at Metrogate logoHere’s about 2 years of construction activity compressed into 3.5 minutes showing Ventus at Metrogate construction from excavation and shoring to forming of the first tower (now under occupancy and now being called home for the first purchasers). The camera was mounted onto the Solaris tower and got knocked around a little and lost power a few times.

Thanks to all the crew who continue to work through all types of weather from bitter cold to scorching heat to build these communities.

Share
This entry was posted in Condo Construction, Scarborough Condos and tagged , , , , , , . Bookmark the permalink.

One Response to Ventus at Metrogate construction time lapse

  1. Pingback: Ventus – new suite designs added, move-in ready | Tridel Talks