Category Archives: Toronto Condos

Ten York and 300 Front presentation centres move

Ten York and 300 Front Street West Presentation Centres are coming together at the new Tridel Store in the downtown location of Front and John Sts. at the base of Tridel’s 49 storey 300 Front Street West. Join in the … Continue reading

Share
Posted in Downtown Toronto Condos, Luxury Condos, Penthouse Condos, Toronto Condos | Tagged , , | Leave a comment

Ten urban townhomes at Yonge & Eglinton come with full condo amenities

Most people tend to associate condo living only with high-rise towers. However, the ten Signature Townhomes at 101 Erskine have changed all that. A Great Toronto Location These 3 storey urban townhomes are neatly nestled just south of the 32-storey … Continue reading

Share
Posted in Luxury Condos, North York Condos, Toronto Condos, Townhomes | Tagged , , , , , , | Leave a comment

Two Old Mill Construction Update for April 2013

Your community is starting to take shape with the bulk of the excavation for Two Old Mill at 90% complete. The caisson wall and tiebacks, which are part of the excavation support system, are now 100% complete. Our construction teams … Continue reading

Share
Posted in Condo Construction, Toronto Condos | Tagged , , , , , , , , , | Leave a comment

One Old Mill Construction Update for April 2013

Excavation of the One Old Mill site is now 100% complete. Our construction teams have completed the concrete pour of the P3 & P2 parking levels, currently working on the P1 level. About 10% of the perimeter walls and columns … Continue reading

Share
Posted in Condo Construction, Toronto Condos | Tagged , , , , , , , , , , | Leave a comment

Blythwood at Huntington Construction Update for April 2013

Our construction teams are now finishing the concrete pour on the roof of the Blythwood at Huntington community. Precast (the exterior skin of the building) is complete up to the 4th floor within the interior courtyard and ground floor at … Continue reading

Share
Posted in Condo Construction, Toronto Condos | Tagged , , , , , , , , , , | Leave a comment

Reve is sold out

Rêve, the distinctive black and red condo at 560 Front St. W., is sold out. Designed by Rudy Wallman Architects and its award winning interior design by Union 31, Rêve was a big success in the downtown Toronto condo market. … Continue reading

Share
Posted in Toronto Condos | Tagged , , , , , , , | 1 Comment

Popular condo suites selling out

In Toronto, you know that spring is on the way because two things start to heat up: the temperature and the real estate market. In the past couple of weeks, we have started selling out of condo suite designs across … Continue reading

Share
Posted in Scarborough Condos, Toronto Condos | Tagged , , , , , , , , , , , | Comments Off

300 Front Street West – March Construction Update

The concrete is now being poured on the top floor of the 300 Front Street West community. Interior finishes such as windows are being installed on the 40th floor, drywall on the 29th, tiles are on the 20th and kitchen … Continue reading

Share
Posted in Condo Construction, Downtown Toronto Condos, Toronto Condos | Tagged , , , , , , , , , , , | Comments Off

300 Front Street West – February 2013 Construction Update

The concrete pour at 300 Front is almost complete. Our construction teams are now pouring on the 47th floor (out of a total of 49 floors). Interior finishes such as windows are being installed on the 37th floor, drywall on … Continue reading

Share
Posted in Condo Construction, Downtown Toronto Condos, Toronto Condos | Tagged , , , , , , , , , , , | 2 Comments

Blythwood February 2013 Construction Update

The concrete pour at Blythwood is almost complete with our construction teams now pouring on the 8th floor (out of a total of 9 floors). Plumbing and electrical rough-ins are continuing installations on the 7th and 8th floors and precast … Continue reading

Share
Posted in Condo Construction, Toronto Condos | Tagged , , , , , , , , , , , | Comments Off