Tag Archives: Metrogate

A Neighborday Manifesto: Because We’re Better Together

Article posted March 26, 2013 from http://www.good.is/ The American mythology of rugged individualism, self-reliance, and the pioneer spirit has traveled far and, like any good myth, picked up embellishments along the way. Emerson, Thoreau, and then later (in her own … Continue reading

Share
Posted in Customer Care, Events, Giving Back | Tagged , , , , , , , , , , , , , , , , , | Comments Off

Ventus at Metrogate 2 more condo suites added

Two more condo suites have been added to the Ventus website. At Ventus 1, the 2 bedroom with den and terrace 2D+DT overlooks the Metrogate Park from the third floor. The 2D+DT suite is available to view and move in … Continue reading

Share
Posted in Scarborough Condos | Tagged , , , , | Comments Off

Ventus Phase 2 March 2013 Construction Update

Municipal occupancy inspections will commence on March 26th for the 22nd floor up to the Penthouse level. Once these permits are received, only the hoist suites will remain in order for the community to achieve full occupancy. Our construction trades … Continue reading

Share
Posted in Condo Construction, Scarborough Condos | Tagged , , , , , , , , , , , , , | Comments Off

Ventus 1 Customer Care Office is Moving

On Thursday, March 28, 2013 the Ventus Phase 1 Customer Care office in suite 306 will be merging with the Ventus Phase 2 Customer Care office located in suite 315. All contact information will remain the same but the service … Continue reading

Share
Posted in Condo Construction, Customer Care, Scarborough Condos | Tagged , , , , , , , , , , , | Comments Off

Ventus 2 availability 1E1 sold out

The last one bedroom 1E1 located on the 28th floor has sold out at Ventus 2 at Metrogate, near Kennedy and Hwy 401. For more prices and floorplans contact the presentation centre at 416-293-5535. For one bedroom options at Ventus 2, consider … Continue reading

Share
Posted in Scarborough Condos | Tagged , , , | Comments Off

Ventus Tower 2 Construction Update

With the start to the New Year we are happy to announce that occupancy permits have been granted by the City up to the 11th floor. The next round of municipal occupancy inspections will commence on January 24th. Our construction … Continue reading

Share
Posted in Condo Construction, Scarborough Condos | Tagged , , , , , , , , , , , | Comments Off

Ventus at Metrogate on the last day of fall

Provident Energy Management Inc. took these two photos today of Ventus and Metrogate Park. Click here for more images of Ventus or check out the image gallery on Facebook. Outside the front entrance to Ventus at Metrogate. Ventus Tower 1 is … Continue reading

Share
Posted in Scarborough Condos | Tagged , , , | Comments Off

Ventus at Metrogate releases 10 more suites

Ventus at Metrogate just released 10 new suites in tower 1. Eight are 2 bedroom suite designs and 3 have patios and 9′ ceilings and are available to move in today.The two bedroom 2G design is a penthouse suite on … Continue reading

Share
Posted in Penthouse Condos, Scarborough Condos | Tagged , , , , , , , | Comments Off

November 2012 Construction Update for Ventus at Metrogate

Ventus tower 1 is almost complete. Occupancy has been granted by the city from P2 to the top Penthouse floors. All that is left are the hoist suite approvals and our teams are working hard on the completion of the … Continue reading

Share
Posted in Condo Construction, Scarborough Condos, Uncategorized | Tagged , , , , , , , , , | Comments Off

Metrogate – TDSB Real Estate Development Challenge

Update: Check out how the projects came out on CTV News! Great story reported on Insidetoronto.com- Learning life’s lessons through a condo tower. “There are over 200 condos currently being built in Toronto,” said Tridel’s Senior Vice President of Sales … Continue reading

Share
Posted in Events, Giving Back | Tagged , , , , , , , , , , , , , , , , , , , | 1 Comment