Tridel Introduces The Innovation Suite at Ten York

Tridel introduces the Innovation Suite at Ten York. Merging forward-thinking technology with contemporary design, the Innovation Suite showcases incredible connectivity, comfort, and convenience while delivering an unparalleled experience in luxury condominium living.

Aqualina at Bayside Achieves LEED Platinum Certification

We are proud to share the news that Aqualina at Bayside, the first phase of our successful Bayside community on the Toronto Waterfront, has achieved LEED Platinum certification!  In fact, Aqualina is Toronto’s first residential building to achieve Platinum certification under the LEED NC DB+C 2009 rating system.

A Well Beneath The Well

As the residential, commercial and retail buildings rise around it, one section of The Well includes the excavation of a deep cistern near the centre of the site. This cistern will connect to the Enwave Deep Lake Water Cooling (DLWC) system to provide heating and cooling to the 11,000 people who will live and work at The Well.

Innovating The Lobby

Digital technology touches almost every aspect of our daily lives so it’s only natural it gets a starring role in making The Lobby unique. This is the third and final post I’m devoting to a major new Tridel initiative. It’s called The Lobby and it delivers a fully integrated and satisfying way for buyers to customize their homes.

Bringing the Lobby to Life

A great project begins with vision and is given life by drawing on a mix of talented people to make it real. To properly tell you about the creation and special features of The Lobby (Tridel’s new high-tech experiential showcase at 4800 Dufferin St.), I’m going to draw further on interviews I conducted with key teammates and our external design partner.